Redesign of 77 years old existing structures of Process House Building and CEHP Boiler housings.
The structures are originally designed in British era with steel section profiles available at that time.
Physical inspection of entire structure to incorporate in design, the deficiency factor due to corrosion & other damage, as well as various changes & modifications done at site in the life span of structures. ‘
Detailed analysis of structures to identify the deficiencies as per latest IS codes. Conceptual solutions are elaborated for strengthening of structure.