GALVANISING FACILITY FOR SKIPPERS LIMITED

GALVANISING FACILITY FOR SKIPPERS LIMITED

  • ULUBEDIA, WEST BENGAL
  • Size:

    • Brownfield Project having construction area: 12,000 m²
  • Services provided:

    • Master Planning
    • Architectural Designs
    • Structural Designs
    • Electrical Designs
    • Mechanical Designs
    • HVAC Designs
    • Fire Fighting Systems
    • Public Health Engineering
    • External Site Development
    • Procurement Assistance
    • Landscaping Layout
    • IGBC Certification
    • Construction Management Services
  • Salient Features:

    • Brownfield project having several challenges:
    • 1) Integration of the existing EOT crane into the new plant building
    • 2) Mono rail arrangement designed considering existing cranes and the plant’s manufacturing process
    • Automatic Galvanizing Plant by GIMECO, Italy (1st in India) – with movement of “black” materials via monorails hanging from the roof structure
    • Total Number of Cranes: 13 T (10 units), 5 T (5 units)
    • Utilities: ETP, STP, Gas Bank, etc.
    • Power Requirement: 7 MW
    • New plant designed to achieve IGBC Gold Rating