Manufacturing Facility (phase 2) of Allied Refractory Products (india) Private Limited

 
 

Manufacturing Facility (phase 2) of Allied Refractory Products (india) Private Limited

  • Manufacturing
  • Sanand, Gujarat
  • Size :

    • Plot Area – Approx. 50,000 m2.
    • Phase 2 Construction area – Approx. 10,000 m2.
  • Services provided :

    • Master Layout Updates
    • Architecture
    • Structural Design
    • Public Health
    • Infrastructure Design
    • Electrical Design
    • Mechanical Utilities
    • Ventilation & Airconditioning
    • Fire Protection
    • Interior Design
    • Procurement services for all the above Fields
  • Salient Features :

    • Building design matching with existing premises and functional requirements.
    • Master Layout & infrastructure revamping considering development of Phase 2 & future Phase 3.
    • Double skin roof & wall cladding for bird control as well as better aesthetics.