Mechanical, Electrical, Piping & Fire Protection (MEPF) works
HVAC works as required for Plant & Admin areas
Salient Features:
Production facility compliant to BRC norms
Building developed to have great Aesthetics – with advantage of low maintenance requirements.
Dust Controlled & Temperature controlled environment for the entire Plant
Manufacturing Facilities for French Fries, Vegetable Processing & RTE together with Cold Storage – all planned in one Building, to optimize the costs – but still maintaining the technical & hygiene requirements.