Mill Building & Electrical Substation Building FGD at Vindhyachal STPP (Stage III – 2X500MW + STAGE IV – 2X500 MW) For L&T Sargent& Lundy, Vadodara.

  • 3D Image

Mill Building & Electrical Substation Building FGD at Vindhyachal STPP (Stage III – 2X500MW + STAGE IV – 2X500 MW) For L&T Sargent& Lundy, Vadodara.

  • Heavy Engineering
  • Waidhan, MadhyaPradesh
  • Size

    • Construction Area :- 3,850m2
  • Services Provided

    • Architecture
    • Civil
    • Structure Design
    • Infrastructure Design
  • Salient Features

    • G+3 RCC framed building of Electrical sub station.
    • Partially steel and partially RCC structure of ball mill house.
    • 2 X 862T capacity Day silos supported at 25m elevation.
    • Dynamic Analysis and design of Ball mill foundations.
    • Design approval by L&T-S&L, L&T Power and NTPC.